A "Green" Company Since 1990
The following procedures are employed to ensure conformance with quality and design specifications for steel weldment fabrications:
* Truck access for raw material and fabricated weldments.
* Steel stock storage capability.
* Lifting, bending, shearing capabilities.
* Welding area size and access capability.
* Welding equipment type and capability.
* Welders AWS or ASME current certification and qualification levels.
* General shop appearance, neat, orderly, safe.
* Safety procedures documentation.
* Personnel protective equipment use, familiarity, and condition.
* Nozzle type, placement, size.
* Dimensional conformance, entire weldment.
* Warp or other disfiguration.
* Weld porosity and appearance.
* Weld leak testing with dye penatrant.
* Special appurtenance detail conformance.
* All edges checked for smoothness. NO sharp edges allowed!
* Truck access for fabricated weldments.
* Coating stock storage capability.
* Surface preparation systems capabilities.
* Coating area size and access capability.
* Coating equipment type and capability.
* Coating application personnel’s current certification and qualification levels (if any).
* General shop appearance, neat, orderly, safe.
* Safety procedures documentation.
* Personnel protective equipment use, familiarity, and condition.
* Surface preparation conformity including steel exposure limits prior to coating application.
* DFT and WFT conformity (as applicable).
* Holiday investigation.
* Weld coatings appearance.
* All edges checked for smoothness and coating coverage. NO sharp edges allowed!
* Conformity of the entire system to the fabrication and shop assembly drawings and documents.
* Form/fit/and function of all major and minor components and appurtenance.
* Electrical system checkout including logic controls for proper operation, load and configuration.
* Proper preparation for shipment and storage.
* Protective enclosures and skids, temporary preservative coatings.
* Partial disassembly and packaging of certain components for secure shipment.
* Lifting, trucking, safety, and handling labels.
* Shipping document preparation and notification of receiving party.