Hydro-Flo
Technologies, Inc.
Quality
Assurance Plan
INTRODUCTION
This manual outlines and describes the methods
and procedures employed by Hydro-Flo Technologies, Inc. to assure
its customers of the highest quality products and services. This
manual will be revised annually or as needed to incorporate new
methods as the same are developed and implemented or as otherwise
required to satisfy customer needs.
Requirements contained in new requests for
quotation, for both individual equipment and engineered systems, are
carefully reviewed to determine that the quality assurance methods
outlined herein are appropriate for such requirements and that such
requirements are within the capabilities of Hydro-Flo Technologies,
Inc.
SCOPE
This manual describes (via narrative and
related exhibits) the overall quality assurance system. This
system addresses the functions of sales, engineering, purchasing,
receiving, in-plant operations/routing, assembly, preparation for
shipping, and quality control.
ORGANIZATIONAL FUNCTIONS
Vice-President / General
Manager:
The
Vice-President / General Manager is responsible for all aspects of
plant operations. He is responsible for all personnel working in
all phases of engineering and manufacturing. Overall responsibility
for plant efficiency and the quality of all products and services
rests with the Vice-President / General Manager.
Project Manager:
The Project
Manager is directly responsible for the efficiency and quality of
all products and services and reports to the Vice-President /
General Manager. More specifically, the Project Manager is
responsible for the following post sale activity:
- Examining
customer drawings, specifications, delivery dates and project
specific sales specification sheets.
- Scheduling
milestone due dates for engineering and production.
- Collating
and sending project submittal package per customer requirements.
- Providing
project progress reports to the customer.
- Reviewing
project bill of materials for accuracy.
- Determining that proper resources are available for all
personnel to properly and efficiently complete their work.
Engineering Manager:
The Engineering
Manager is directly responsible for the efficiency and quality of
all designs and drawings and reports to the Vice-President / General
Manager. More specifically, the Engineering Manager is responsible
for the following post sale activity:
- Examining
customer drawings, specifications, delivery dates and project
specific sales specification sheets.
- Verifying
proposed equipment meets customer needs in form, fit and
function.
- Scheduling
workload for all persons in department to meet scheduled
milestones.
- Generation
of project submittal package per customer requirements
including, but not limited to: GA drawings, component data
sheets, PID, electrical schematics.
- Generating
project bill of materials.
- Determining that proper resources are available for all
personnel to properly and efficiently complete their work.
Production Manager:
The Production
Manager is directly responsible for the efficiency and quality of
work performed in his department and for the personnel assigned to
that department. The Production Manager is also directly
responsible for all work performed by outside fabricators/vendors.
The Production Manager reports directly to the Vice-President /
General Manager and has the following post sale responsibilities:
- Examining
drawings and specifications.
- Examining
and checking work and production throughout the plant.
- Determining that tools, gauges and fixtures are being properly
used within the department.
- Instructing and periodically checking the work of all personnel
assigned to the department for accuracy and quality of
workmanship.
- Verifying
all outsourced components pass functional QC check.
- Marking up
all assembly drawings to reflect as built changes.
Shop Hands:
All Shop Hands
report directly to the Production Manager. The Shop Hands are
responsible for properly setting up work assigned to them and
operating the equipment in an efficient and workmanlike manner.
They are initially responsible for inspections of their own work
with respect to accuracy and quality of work and for determining
that parts otherwise meet all applicable customer specifications.
They must have the in-process inspector check and initial the
assembly drawing as compared to the finished product.
Quality Manager:
The Quality
Manager is responsible for administering the quality assurance
system. The Quality Manager reports to the Vice-President of
Operations.
The Quality
Manager is responsible for examining purchase orders and drawings to
determine that the proper revision level is released to
manufacturing.
The Quality
Assurance function comprises the following areas:
- Bill of
Material Review
- Receiving
Inspection
- In-Process
Inspection
- Final
Inspection
- QC
Documentation Control
All procedures
relating to inspection and originating at Hydro-Flo Technologies,
Inc. are subject to approval by the President.
Testing Instrument Issuance and
Control:
The Quality
Manager issues all company-owned inspection equipment that is to be
removed from the Quality Assurance Department. An Instrument
Location Form to show when an instrument is received/removed and
location of use must be signed by the person receiving the gauge or
instrument. All gauges and inspection equipment must be returned to
the inspection area in a timely manner.
All inspection
equipment is checked and calibrated at the interval shown on the
gauge/equipment Calibration Card. Such calibration shall
apply to employee-owned equipment that may have a direct impact on
the quality of products or services.
The inspection equipment will be checked and
calibrated as required by the instrument manufacturer or appropriate
governing body of standards.
Receiving Inspection:
Receiving
Inspection is responsible for inspecting all incoming material and
parts/components. This inspection will be performed based on
customer prints and Hydro-Flo Technologies, Inc. purchase orders.
All components
will be inspected and tagged for appropriate job # before being
stocked.
All necessary
components will be inspected and the results noted on the routing.
A green Accepted Material Tag will then be attached to the
parts or container.
All raw
materials and purchased piece parts found to be defective or
nonconforming (based on prints, specifications, and/or purchase
orders as applicable) will be rejected. The supplier will be
contacted by phone or facsimile and the material will be returned
for rework or replacement. Further, the supplier will be sent a
Corrective Action Form, which must be filled out and returned.
If the customer
furnishes material, the inspection procedure shall include the
following:
- Examining
upon receipt to detect any damage in transit.
- Inspecting
for completeness and proper type.
- Periodically inspecting to assure adequate storage conditions.
- Properly
identifying and protecting from improper use.
In-Process Inspection:
In-process
inspection shall be responsible for determining that all assembly
parts, components and sub-assemblies, manufactured, serviced or
repaired by Hydro-Flo Technologies, Inc. conform to customer
specifications before the equipment is released for final QC.
The in-process
operator is required to inspect each assembly to determine that the
proper components are being used to complete the final product per
the assembly drawings. The operator then initials the routing
before proceeding with final assembly.
FINAL INSPECTION:
Final
Inspection shall be responsible for carefully inspecting all parts
prior to shipment and completing the final inspection checklist in a
timely manner.
No item on the
final inspection checklist shall be marked as satisfactory until the
Quality Manager is completely satisfied that it meets customer
prints and specifications and Hydro-Flo Technologies, Inc. quality
requirements.
The Quality
Manager will not sign the final inspection checklist until all items
have been checked. He or she will then fill out and attach an
Accepted Material Tag to the assemblies or equipment before it
is released for shipment.
If any
equipment or assembly is found to be defective, the inspector will
note the same on the checklist and will attach a Rejected
Material Tag to the equipment. The equipment will then be
stored in a separate area while a determination is made as to the
disposition of such equipment (i.e., rework, scrap, use as-is
(variance)).
All final inspection will be performed to
customer specification.
CONTROL OF NONCONFORMING MATERIAL
When material is
determined to deviate from specifications or drawings, the following
procedure will be followed:
- A Rejected
Material Tag will be filled out and fastened to the assembly or
equipment by the Quality Manager
- Rejected
assembly will be stored apart from acceptable equipment.
- Vice-President of Operations and the Quality Manager will
determine the disposition of the rejected material.
When purchased
material is found to be defective or not to required specifications,
the supplier will be contacted by phone or facsimile. The material
will be returned for rework or replacement and the supplier will be
sent a Corrective Action Form, which must be filled out and
returned prior to payment.
When material
produced in the plant is found to be defective or not to required
specifications, the shop hand responsible for the nonconformance
will be contacted and a written corrective action will be filled out
and turned in to the Project Manager and a copy provided to the
Production Manager.
Purchasing Procedure:
The purchasing
agent shall place all orders for materials used in Hydro-Flo
Technologies, Inc. contracts with reputable firms. Materials
purchased shall be as specified by customer material list or
drawings.
The purchasing
department will be responsible for determining that suppliers have
quality control programs in place that are consistent with contract
quality requirements of Hydro-Flo Technologies, Inc.
Preservation & Packing:
It is the
policy of Hydro-Flo Technologies, Inc. to preserve and package parts
in a manner that will prevent deterioration or damage, or as
otherwise specified by the customer.
Internal
Quality Audits
After the completion of
each project, an audit will be conducted to discuss the quality
issues that arose during production, assembly, in-process
inspections, final inspections and equipment start up. The findings
of the audits will be used to improve the overall quality assurance
plan in the forms of training and inspection.
Training
All personnel, including
outside fabricators, involved in the manufacture, assembly and
inspection of equipment manufactured by Hydro-Flo Technologies will
be trained in the QC procedures used by Hydro-Flo Technologies. As
new procedures are implemented, all personnel will receive updated
literature and hands on training to insure that the new procedures
are properly implemented.
Records
Normal procedure of
Hydro-Flo Technologies, Inc. is to maintain records of purchasing,
receiving and production and inspection records for a minimum of
three (3) years, unless otherwise required by our customer. |